• Subtitle
    Subtitle English
    • 1. English
    • 2. Spanish
    • 3. Latin
    • 4. Portugese
    • 5. Italian
    • 6. French
    • 7. German
    • 8. Dutch
    • 9. Russian
    • 10. Japanese
    • 11. Chinese
    • 12. Arabic
  • Subtitle
    Server Local
    • Server Local
    • Apple TV 4K
      Kijk maar 4K
    • Google Play Movies 4K
      Kijk maar 4K
    • Fandango At Home 4K
      Kijk maar 4K
    • Amazon Video HD
      Kijk maar HD
    • Apple TV HD
      Kijk maar HD
    • Google Play Movies HD
      Kijk maar HD
    • Fandango At Home HD
      Kijk maar HD
    • Apple TV SD
      Kijk maar SD
    • Google Play Movies SD
      Kijk maar SD
    • Fandango At Home SD
      Kijk maar SD
This video option does not contain pop-up windows and the load is optimal, you can watch without cuts.
Studio 60 on the Sunset Strip

1 Seizoen
22 Aflevering

Studio 60 on the Sunset Strip - Season 1 Episode 5 Aflevering 5


(118 votes, average: 7.40/ 10)

42 minuten 2024 HD

  • Share

During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series.

img

Seizoen

Vergelijkbaar

  • 2019
    imgS E

    This Time with Alan Partridge

    This Time with Alan Partridge

    7.80 2019 HD

    Alan is handed a career lifeline - the chance to stand in as co-host on This Time, a weekday magazine show. But can he capitalise on the opportunity?

    img
  • 1981
    imgS E

    Fitz and Bones

    Fitz and Bones

    1 1981 HD

    Fitz and Bones is a short-lived American television series, starring Dick and Tom Smothers, that aired on NBC in 1981.

    img
  • 2002
    imgS E

    Less than Perfect

    Less than Perfect

    6.90 2002 HD

    Claude Casey moved up in the secretarial world of television news, from temp to the anchor's desk. After her boss hires her full time, Claude...

    img
  • 2019
    imgS E

    Studio City

    Studio City

    1 2019 HD

    The life of Hollywood actor Sam Stevens and the rest of the "Hearts on Fire" cast.

    img
  • 1998
    imgS E

    LateLine

    LateLine

    1 1998 HD

    LateLine is an American TV sitcom that ran on NBC from March 17, 1998, through March 16, 1999. Due to an abrupt cancellation, there were seven...

    img
  • 2001
    imgS E

    Réal-TV

    Réal-TV

    1 2001 HD

    img
  • 1998
    imgS E

    Sports Night

    Sports Night

    7.30 1998 HD

    The offbeat cast and crew of a sports news show deal with professional, personal, and ethical challenges while functioning in a pressure-cooker work...

    img
  • 1970
    imgS E

    Nobody's Watching

    Nobody's Watching

    1 1970 HD

    Nobody's Watching is a television program that was never aired. It originated with and was written by Scrubs creator Bill Lawrence, as well as Neil...

    img
  • 2003
    imgS E

    An American in Canada

    An American in Canada

    1 2003 HD

    Jake Crewe is an American television news host who is forced, after beating up his station manager, to accept a job in Calgary, Alberta as the host...

    img
  • 1983
    imgS E

    Telecat

    Telecat

    7.20 1983 HD

    Created by French surrealist artist Roland Topor and director Henri Xhonneux, Telecat is a news show parody hosted by a tomcat named Groucha (who...

    img

Aanbeveling

  • 2011
    imgS E

    Mr. Sunshine

    Mr. Sunshine

    6.32 2011 HD

    Ben Donovan is a self-involved manager of a second-rate San Diego sports arena who begins to re-evaluate his life on his 40th birthday. Working...

    img
  • 2015
    imgS E

    Texas Rising

    Texas Rising

    6.30 2015 HD

    A chronicle of the Texas Revolution, the uprising against the tyranny of Mexican dictator Santa Anna, from the battle of the Alamo to the battle of...

    img
  • 2011
    imgS E

    Billy on the Street

    Billy on the Street

    6.60 2011 HD

    Comedian Billy Eichner, unfiltered and unapologetic, hits the streets of New York City to test unsuspecting strangers on their knowledge of music and...

    img
  • 2013
    imgS E

    Newsreaders

    Newsreaders

    7.38 2013 HD

    Newsreaders is a quarter-hour format American television comedy that lampoons the news magazine genre. The series is a spinoff of the Adult Swim show...

    img
  • 2022
    imgS E

    Lucky!

    Lucky!

    8.80 2022 HD

    The extraordinary story of Bernie Ecclestone's meteoric rise from post-war car dealer to the creation and 50-year reign over the cutthroat world of...

    img
  • 1993
    imgS E

    Family Passions

    Family Passions

    9.00 1993 HD

    Family Passions was the first hour long television serial produced in Canada and Germany. It was produced and distributed by Baton Broadcasting...

    img
  • 1999
    imgS E

    Jack & Jill

    Jack & Jill

    7.50 1999 HD

    A lighthearted romantic comedy about post-collegiate life, love and career in New York City.

    img
  • 2007
    imgS E

    The Dresden Files

    The Dresden Files

    6.90 2007 HD

    A Chicago-based wizard works as a private investigator.

    img
  • 2006
    imgS E

    The Game

    The Game

    7.70 2006 HD

    When her boyfriend Derwin Davis is chosen as the new third-string wide receiver for the San Diego Sabers, Melanie Barnett decides to attend a local...

    img
  • 2014
    imgS E

    Madam Secretary

    Madam Secretary

    7.00 2014 HD

    After years away from the CIA, Elizabeth McCord is pulled back into the political arena. The newly appointed Secretary of State is tough, fair, and...

    img